Based in the East Midlands around the 1950s. This mixed traction layout is fully DCC operational inc points and signals. Although only 80% complete with the scenery and buildings to do it is a work in priogress. When complete it will be 24 feet long and about 3 feet deep with a four road fiddle yard to the rear of the layout.